|
Topkapi Palace
Converted into a museum on April 3, 1921 upon an order by Atatürk, founder and first
president of the Republic of Turkey, this palace attracts numerous visitors from
around the world. Topkapi Palace now illuminates the magnificent history of Ottoman
Empire by using Teksan Generator's generators.
City's Nişantaşı
Built by Gülaylar Group in Nişantaşı district of Istanbul as a US$ 125 million project,
City's Nişantaşı is a shopping mall covering a footprint area of 17,000 square meters
and has been equipped with TJ1540 MS and 2 x TJ1425 MS generator sets built by Teksan
Generator as a precaution for power failures. The fact that Teksan Generator was
selected for such grand project proves once again the reliability and superior services
of Teksan Generator.
Uphill Court
One of the most distinguished housing projects built in Istanbul is the Uphill Court
sites designed and built by Varyap and Teknik Yapı. Located in Ataşehir district
at the Asian side of Istanbul and in Bahçeşehir district at the European side of
Istanbul, these sites provide high living standards. Their motto is "We aim high”,
emphasizing their high comfort, technology and security standards. So it is only
natural that generator sets provided by Teksan Jeneratör were selected for both
Uphill Court Ataşehir and Uphill Court Bahçeşehir.
Garanti Bank
Garanti Bank is one of the largest banks in Turkey. It is a synonym for reliability
and operates hundreds of branches throughout Turkey equipped with generator sets
provided by Teksan Generator.
Medical Park
Medical Park Sağlık Group continues to make investments in the healthcare sector.
This group aims to make its high quality medical services available throughout Turkey.
It operates various hospitals in many regions of this country, allof which were
equipped with Teksan Generator's generator sets..
Casper
Casper was started as a computer company in 1991 in a 40 m² office, and grew at
a dazzling speed. The company moved its offices to a new, US$ 40 million building
designed in the shape of a hard disk in Ümraniye district of Istanbul, which was
equipped with Teksan Generator's generators as standby power. 2 units of 715 kVA
generators ensure Casper to manufacture computers in an uninterrupted manner.
Turkish Institute of Statistics
Turkish Institute of Statistics is growing thanks to a continuous investment process.
It recently purchased a TJ1425MS model generator built by Teksan Generator to ensure
uninterrupted flow of its information processes and data.
Formula1
Management of Formula 1 has been renting diesel generator sets from Teksan since
2005 in order to broadcast the local stages of this famous race to viewers in this
country and all over the world.
|